校园建设

welcome皇冠手机版学派 is undergoing a campus transformation that reimagines spaces where we gather to learn, 联系和竞争.
Construction is underway on our second driveway and the new athletic building near the soccer field. We are also making improvements that enhance academic and recreational spaces in lower, 初中及高中. Follow our progress here — and thank you for your patience as we drive forward!

1项清单.

  • 校园的改进

    1 大学足球场
    2 棒球场
    3 Main Building Roof Replacement
    4 Tennis Court Resurfacing
    5 第二个车道
    6 体育中心
    7 额外的停车
    8 体育停车
    9 儿童早期 Playground
    10 北开车

1项清单.

  • 第二个车道

    Construction of our second driveway began in mid-September and is expected to be complete during the second semester of this school year. 1,250英尺, two-lane drive begins south of the current State Line entrance and curves around the outfield of the Graves Family Baseball Stadium, leading to the middle school entrance.
    阅读更多

1项清单.

  • 体育建筑

    The next major addition to Knights’ facilities is the $3.9 million athletic building. The building will provide essential support for a range of sports, 包括足球, track, 越野, 棒球和网球. The second floor boasts state-of-the-art golf simulators and practice putting greens. The building will also include a dance studio, 团队会议室, 更衣室, spectator restrooms and a concession stand. Designed by Multistudio and built by OnSite, it is expected to open during the 2024-2025 school year.
    阅读更多

1项清单.

  • Soccer Access During Construction

    Pedestrian access to the soccer field will be impacted during construction of the athletic building and driveway. Currently, fans will access the soccer field through the west gate. 从A停车场, B或C, walk south on the State Line Road sidewalk and use the gravel path at the athletic complex entrance to reach the gate.
    Fans may also park at the Church of the Nazarene and walk north on the State Line sidewalk to the athletic complex entrance. The gravel lot will be closed to vehicles. Temporary closures and redirection will occur as construction progresses. Please check this page frequently for updates. 

1项清单.

  • 额外的停车

    Driveway construction includes a parking lot within the middle school circle drive and an additional lot at the south entrance to the athletic facilities. The two lots will add more than 100 spaces for families, faculty and staff and visitors. The existing gravel lot near the baseball field is closed during construction. Lots A, B, C and D remain open.

1项清单.

  • 儿童早期 Playground

    Installation of the early childhood playground canopy is nearly complete! Finishing touches include paint, applied the first week of October, pouring concrete around the canopy footers, landscaping and leveling the remaining grassy area beyond the concrete surface. The canopy will create additional outdoor learning, PE and recreational space for preschool, prekindergarten and kindergarten classes. We look forward to welcoming our youngest learners to their new playground area by mid-October.

1项清单.

  • 建筑物及场地

    • Phase two of the school roof replacement in the middle school is complete. 
    • Tennis court resurfacing complete.
    • Locker rooms and Hall of Champions restroom renovation complete.
    • Benches and storage cubby installation underway in middle & 上学校.
    • State Line marquee message board replaced. New lettering installation and brick brick repair will be completed by the end of the year. 
    • Three new HVAC units for the middle & 上学校 will be installed this year.

校园建设 News

谢谢你!

谢谢你! for your patience during our construction projects. 交通模式, 户外休息, pedestrian access and parking may be temporarily shifted during some phases of the work. Please pay attention to signage and restricted work areas. These projects make a lasting impact on the appearance and function of the school, and improve the quality of the Barstow experience for every student. We are grateful for your support.

3人名单.

  • 肖恩·福斯特摄

    巴蒂尔 福斯特 

    President of the Barstow Schools
    (816) 277-0304
  • 丽兹·巴托摄

    莉斯 巴托 

    Senior Vice President of the Barstow Schools & 首席运营官
    (816) 277-0312
  • 罗伯特·韦恩摄

    罗伯特。 韦恩 

    Director of Safety, Facility Services & 运输
    (816) 277-0431